Portofolio

  1. Engineering For Filter Separator TP‐V‐82‐01, ORF Muara Karang Future Development Project (Phase 2). PT. Pertamina Hulu Energi – PT. Indonesia Power Tanjung Priok. Sub Contractor to PT. Samudera Teknindo Hydraumatic – Karawang & PT. PFCE Truba Consortium. Jobs & Responsibilities: Prepare Mechanical Calculation using PV Elite 2008, design and draft drawing for Filter Separator. Survey for detail dimensioning of the vessel and the installation, and material take off for fabrication process.
  2. Engineering Design, Drafting & Fabrication Of Catridge Filter, for CV Arian Pratama ‐ PT. Pertamina EP Prabumulih Palembang.
  3. Engineering Design for Waste Heat Boiler MAN 12 MW & 18 MW, PT. Perusahaan Listrik Negara Belawan Sumatera Utara, Sub contractor to PT. Jasuma Austindo ‐ Jakarta. Jobs & Responsibilities: Prepare Mechanical Calculation using PV Elite 2008, design the products, manage the drafter and sub contractor to draw and assist the fabrication process at sub contractor PT. Multifabrindo Gemilang for the following products: Evaporator & Economizer complete with civil construction, Steam Drum, Feed Water Tank & Deaerator, Blow Down Tank, Condensate Tank, Dosing Tank, Sampling Cooler, Expansion Joint.
  4. Engineering Design & Calculation of Compress Air Tank 5000L for PT. Diamond Cold Storage
  5. Engineering Design & Calculation of 8” Screw Conveyor Cap. 4,5 Ton Per Hour for PT. Mayora Indah, Tbk